Search this site
Skip to main content
Skip to navigation
CRUIV
File list
Hoang Mai DED
Ngoc Lac Construction Design
Thach Ha Construction Design
Ninh Binh_Hydraulics Modelling
Project Adjustment
Project Background
TOR
Roles of REs
Thach Ha subproject
Project maps
Thach Ha maps
Project Indicators
Project procedures
Project extension steps
WWTP
WORKPLAN
AFD
AFD missions
NOL
Other Letters
Events
TA Field trips
Meetings
C&V PLAN
Reference -Wastewater
Capacity building
Deliverables
Finance
Construction
Connection Survey - Khảo sát đấu nối
URBAN PLANNING
Safeguard
Procurement
CONTRACTS - Hợp đồng
IT Instructions
Importing Styles in Docx
Zoom meeting instructions
Working platform
Press Coverage
Legal documents
Decision 896
Phat Diem legal docs
Huong Khe legal docs
Thach Ha legal docs
Administration
Templates
Translation
Meeting Minutes
Residential Engineer
CRUIV_Consultant's Fied Days
CRUIV
Project maps
CRUIV project location (KMZ)
Project Maps
2023-03-26_Thach Ha map with 6 construction packages.pdf
Thach Ha map (2023-03-26)
2023-01-13_Huong Khe.pdf
Huong Khe map (2023-01-13)
Google Sites
Report abuse
Page details
Page updated
Google Sites
Report abuse